Skip to main content
N.C. Division of Water Quality
About the Division of Water Quality | Accesskey = a Contact Us | Accesskey = c Division of Water Quality Sections | Accesskey = s Glossary | Accesskey = g
To preserve, protect and enhance North Carolina's water... dwq banner

Navigation Links

PERCS Unit - Pretreatment :: Other Downloads

Pretreatment 101 - this section has been moved to the Training webpage

Headworks Analysis downloads - Headworks Analysis Page

Industrial Waste Survey downloads - Industrial Waste Survey Page

Pretreatment Annual Report (PAR) downloads - PAR Guide Page

Industrial User Pretreatment Permit (IUP) Writing downloads - Permit Writing Page This includes information on Categorical Regulations, Determinations, and Limits

Other Helpful Pretreatment Downloads

Ammonia and Total Nitrogen IUP Limit Guidance (7/05)

Biocide/Chemical Pretreatment Worksheet - Form PT101

Biocide/Chemical Pretreatment Worksheet - Form PT101 Guidance

New Item2008 Enforcement Response Plan (ERP) (June 17, 2008) : Chart and narrative now in one document. See new Instructions Box on page 1 for details on other changes.

Enforcement - So your SIU has a Limits Violation, What do you do?(New Item Aug 2008)

Enforcement - So your SIU has a Reporting Violation, What do you do? (New Item Aug 2008)

EPA Industrial Wastewater Contacts In the Effluent Guidelines Program (Catagorical Dischargers)

SIU Inspection Form

Long/Short Term Monitoring Plan : LTMP / STMP Model Shell (to be customized for a specific POTW). Updated July 29, 2004

NC DWQ PERCS Pretreatment Compliance Inspection (PCI) Form (October 11,2007)

NC DWQ PERCS Pretreatment Audit Form (October 11,2007)

Pumpkin Book (.pdf file): Guidance and Evaluation, Resolution, and Documentation of Analytical Problems Associated with Compliance Monitoring [Matrix Interference].

Standard Conditions for NPDES Permits

Streamlining Guidance for NC POTWs (posted 9/25/06)

More EPA Guidance on Streamlining, including Fact Sheets

Sewer Use Ordinance -2006 update (streamlining final, changes in red. note some changes are not related to streamlining, but are still required): (Posted 9/25/06)
NOTE: All NC POTWs must submit their SUOs by 6/1/2007 to address the 2006 changes.

NEW!! 2006 SUO Discussion and Checklist (Posted 10/16/2006) NC POTWS should use this new discussion and checklist. It incorporates all needed info from the previous 2004 Discussion and Checklist.

Spill/Bypass Letter

Spill/Bypass Form

top of pagetop of page

 



[ Contact Staff ] [ Comp Guide ] [ Files ] [ Headworks Analysis ] [ Links ] [ PAR Guide ] [ Permit Writing ] [ Training] [ Mercury ]



URL: http://h2o.enr.state.nc.us/Pretreat/index.html
Last updated: October 11,2007
NC Department of Environment and Natural Resources
Division of Water Quality, Pretreatment Unit
Raleigh, North Carolina