PERCS Unit :: Collection Systems - Home Page
  
Any references to the 15A NCAC 2H .0200 rules will be overridden by the new 2T Rules. Rule Highlights:
- Sewer extensions are mainly covered under 2T .0300.
- System-wide Collection System Permitting is covered under 2T .0400.
- The available power reliability option for pump stations can no longer be wet well storage for waters near Class C. Stations over 15,000 gallons per day require a permanent generator and those under require a portable generator receptacle. All stations now require telemetry/auto-dialer in addition to audible and visual alarms.
- For developer permitted projects, a copy of the Declarations must be submitted with the final engineering certification to demonstrate compliance with the terms of the Operational Agreement.
- More flow rates have been included in 2T .0114.
- Change of ownerships for private permitted projects (i.e. developer to homeowner association or public utility) must be submitted at the time of final certification.
- The separation distance between storm sewers and sanitary sewers has been increased to 24 inches unless structural bridging is provided.
- Separation distances between reclaimed water lines and wetlands and sanitary sewers has been added to 2T .0300.
Documents and Files
- Frequently Asked Questions : Click
Sewer Line Permitting
For information regarding sewer line extention permits please visit the Construction Grants
& Loans Website : http://www.nccgl.net/
|